Chat: Córdoba Project

Pablo: The rack with the modular servers is already configured. Initial load tests show 15% more efficiency than the previous model.

Ana Paula: Perfect. I will coordinate the review of the fiber connections for next week. Do we need any additional adapters?

Pablo: No, the SFP+ ports are already included in the batch. We just need to verify the attenuation on the long stretches.

Ana Paula: Agreed. I will prepare the certification report for ENACOM with the data from the Australian equipment.

Client Results

What Our Clients Say

“We implemented modular servers imported from Australia in our data center in Córdoba. Integration with existing racks was straightforward, and energy consumption reduction reached 18% in the first three months. Technical support responded in less than two hours when we needed to adjust the network configuration.”

Network Infrastructure

“The interactive network diagrams provided with the connectivity project for Santiago del Estero allowed us to train the technical team in one week. The vector documentation facilitated the detection of topology bottlenecks before physical installation. A real saving in deployment time.”

Technical Planning

“We needed compact base stations to cover 120 km of provincial highways. Powercom delivered the equipment in 45 days, with all ENACOM certifications in order. Field performance exceeded technical specifications: latency below 8 ms under high interference conditions.”

Rural Connectivity

“The automated ordering system allowed us to manage the replenishment of 24 modular servers without specification errors. Each unit arrived with its factory configuration ready for rack mounting. The technical documentation in Spanish facilitated commissioning by the local team.”

B2B Logistics

“We worked with Powercom to upgrade the fiber optic backbone in three departments. The imported transmission equipment doubled bandwidth capacity without the need for additional civil works. Remote monitoring allowed us to adjust network parameters in real time during the first week of operation.”

Fiber Backbone

Direct connections

Frequently asked questions about telecommunications infrastructure

Clear answers about equipment, importation, and technical support for B2B operators in Argentina.

All equipment has a valid ENACOM certification and complies with international standards for electrical safety and electromagnetic compatibility. A corresponding test report is provided for each batch.

The estimated time is 45 to 60 business days from order confirmation, depending on factory availability and customs procedures. We offer weekly shipment status tracking.

Yes, we have a team of specialized engineers who provide remote and on-site assistance during startup. The service includes initial configuration, connectivity tests, and customized technical documentation.

We work with both schemes. For expansion or replacement projects, we sell modules, power supplies, interface cards, and antennas individually. Check availability based on the model.

The standard warranty is 3 years against manufacturing defects, with the possibility of extending it to 5 years. It includes advance replacement of defective units within 72 business hours after diagnosis.

Cookie settings